Monday 4 May 2015

Under floor heating day

I have finished the tiling within the shower area, apart from the finishing of the nook. These tiles had to be cut on the wet tile cutter, and I made a special tunic to keep me dry!

Those tiles are all up, except from completing the nook, and I have started on the flat wall tiles, ready to mark out where the shower screen goes.
I can then start laying floor tiles.

Under the floor will go a heated floor cable. First I had to get the wires through the wall to the controller on the other side.


Then I cleaned the floor ready to put down the cable.
The cable needed a little organisation so the feet are warm when on the toilet!
Finally, the system is tested before laying the tiles over it.